CERTIFICATE
SRPS ISO 9001
BS ISO 14001
OHSAS ISO 18001

Preuzmite Knjigu referenci

Main project the installation of standard and nonstandard equipment in the plant for the production of copper powder


Godina: 2010
Investitor: Pometin-TIR
Status: Završen

The object of this project is to improve the movement of the working staff from unit to unit and to improve the internal transport of copper powder. Also thermal insulation of a housing on the bag filter was derived in order to prevent condensation of output gases from the plant which includes:
- Formation of the heating system of the conical filter with a heating cable,
- Thermal insulation of the vertical part of the chamber and the lid,
- Thermal insulation of the pipeline.

Project documentation was made and by the same works are carried out.


nazad