MAJOR PROJECTS OF ADAPTATION OF CEMENT MILL NO 1

Godina: April 2010
Investitor: Holcim Serbia
Status: Završen

Develop detailed design adaptation system of grinding at the mill no. 1 in cement production plant in Popovac HOLCIM. Project was done on the basis of previously acquired equipment, installation of equipment selected drawings made by the same manufacturer as well as all other technical data received from the vendors. In addition, used as the basis of drawings of the existing state of a mill made in the earlier projects and drawings obtained by recording the derivative of the current situation of the mill first